Related provisions for REC 2.5.20

1 - 14 of 14 items.

Search Term(s)

Filter by Modules

Filter by Documents

Filter by Keywords

Effective Period

Similar To

To access the FCA Handbook Archive choose a date between 1 January 2001 and 31 December 2004 (From field only).

REC 2.5.1UKRP
Schedule to the Recognition Requirements Regulations, paragraphs 3 – 3H4Paragraph 3 – Systems and controls4(1)The [UK RIE] must ensure that the systems and controls, including procedures and arrangements,4 used in the performance of its functions and the functions of the trading venues it operates are adequate, effective4 and appropriate for the scale and nature of its business.(2)Sub-paragraph (1) applies in particular to systems and controls concerning - (a)the transmission
REC 2A.3.2GRP
The guidance in relation to the recognition requirements in the sections of REC 2 listed in Column A of the table below applies to an RAP in relation to the equivalent RAP recognition requirements listed in Column C and (if shown) with the modifications in Column B. Table: Guidance on RAP recognition requirementsColumn AREC 2 guidance which applies to an RAPColumn BModification to REC 2 guidance for an RAPColumn CRelevant RAP recognition requirementREC 2.2.2 G to REC 2.2.7 G (Relevant