Related provisions for BIPRU 4.3.29
1 - 5 of 5 items.
A firm must use LGD estimates that are appropriate for an economic downturn if those are more conservative than the long-run average. To the extent a rating system is expected to deliver constant realised LGDs by grade or pool over time, a firm must make adjustments to its estimates of risk parameters by grade or pool to limit the capital impact of an economic downturn.[Note:BCD Annex VII Part 4 point 74]
A firm must use conversion factor estimates that are appropriate for an economic downturn if those are more conservative than the long-run average. To the extent a rating system is expected to deliver realised conversion factors at a constant level by grade or pool over time, a firm must make adjustments to its estimates of risk parameters by grade or pool to limit the capital impact of an economic downturn.[Note:BCD Annex VII Part 4 point 88]
An obligor grade means for the purpose of BIPRU 4 as it applies to the sovereign, institution and corporate IRB exposure class a risk category within a rating system's obligor rating scale, to which obligors are assigned on the basis of a specified and distinct set of rating criteria, from which estimates of PD are derived. A firm must document both the relationship between obligor grades in terms of the level of default risk each grade implies and the criteria used to distinguish