Home Technical Standards 2020 | Commission Delegated Regulation (EU) 2020/1224 ANNEX XIII
You are viewing ANNEX XIII as of ANNEX XIII was last updated on 01/01/2021.

ANNEX XIII

ANNEX XIII

01/01/2021EU

INVESTOR REPORT INFORMATION – ASSET BACKED COMMERCIAL PAPER SECURITISATION

Field codeField nameContent to reportND1-ND4 allowed?ND5 allowed?
Programme information section
IVAS1Unique Identifier - ABCP ProgrammeThe unique identifier assigned by the reporting entity to this ABCP programme in accordance with Article 11(1) of Delegated Regulation (EU) 2020/1224.NONO
IVAS2Data Cut-Off DateThe data cut-off date for this data submission.NONO
IVAS3Reporting Entity NameThe full Legal name of the entity designated as per Article 7(2) of Regulation (EU) 2017/2402; that name must match the name entered in for that entity in field SEAP3 in the counterparty information section. The name entered must match the name associated with the LEI in the Global Legal Entity Foundation (GLEIF) database.NONO
IVAS4Reporting Entity Contact PersonFirst and Last name of the contact person(s) responsible for preparing this securitisation data submission and to whom questions on this data submission must be addressed.NONO
IVAS5Reporting Entity Contact TelephoneDirect telephone number(s) of the contact person(s) responsible for preparing this securitisation data submission and to whom questions on this data submission must be addressed.NONO
IVAS6Reporting Entity Contact EmailsDirect email address(es) of the contact person(s) responsible for preparing this securitisation data submission and to whom questions on this data submission must be addressed.NONO
IVAS7Trigger Measurements/RatiosHas any underlying exposure-related trigger event occurred? These include any delinquency, dilution, default, loss, stop-substitution, stop-revolving, or similar exposure-related events which impact the securitisation, as at the data cut-off date. This also includes if there is a debit balance on any Principal Deficiency Ledger or an asset deficiency.NOYES
IVAS8Non-Compliant Exposures

Pursuant to Article 26(1) of Regulation (EU) 2017/2402, enter the total value of exposures, using the current balance as at the data cut-off date, not compliant with Article 24(9), 24(10), and 24(11) of Regulation (EU) 2017/2402.

Include the currency in which the amount is denominated, using {CURRENCYCODE_3} format.

YESYES
IVAS9Weighted Average LifeEnter the remaining weighted average life of the pool of exposures underlying this ABCP programme, expressed in years.YESYES
IVAS10Risk Retention Method

Method for complying with risk retention requirements in the EU (e.g. Article 6 of Regulation (EU) 2017/2402, or until entry into force, Article 405 of Regulation (EU) No 575/2013):

Vertical slice - i.e. Article 6(3)(a) (VSLC)

Seller's share - i.e. Article 6(3)(b) (SLLS)

Randomly-selected exposures kept on balance sheet - i.e. Article 6(3)(c) (RSEX)

First loss tranche - i.e. Article 6(3)(d) (FLTR)

First loss exposure in each asset - i.e. Article 6(3)(e) (FLEX)

No compliance with risk retention requirements (NCOM)

Other (OTHR)

NOYES
IVAS11Risk Retention Holder

Which entity is retaining the material net economic interest, as specified in Article 6 of Regulation (EU) 2017/2402, or until its entry into force, Article 405 of Regulation (EU) No 575/2013):

Originator (ORIG)

Sponsor (SPON)

Original Lender (OLND)

Seller (SELL)

No Compliance with Risk Retention Requirement (NCOM)

Other (OTHR)

NOYES
Transaction information section
IVAN1Unique Identifier - ABCP ProgrammeReport the same unique ABCP programme identifier here as the one entered into field IVAS1.NONO
IVAN2Unique Identifier - ABCP TransactionThe unique identifier assigned by the reporting entity to this ABCP transaction in accordance with Article 11(2) of Delegated Regulation (EU) 2020/1224.NONO
IVAN3Data Cut-Off DateThe data cut-off date for this data submission. This must match the data cut-off date in the underlying exposure templates submitted under Annex XI.NONO
IVAN4SIC Industry CodeOriginator industry SIC Code, as set out in the condensed SIC Code List used by UK Companies House.NOYES
IVAN5Risk Retention Method

Method for complying with risk retention requirements in the EU (e.g. Article 6 of Regulation (EU) 2017/2402, or until entry into force, Article 405 of Regulation (EU) No 575/2013):

Vertical slice - i.e. Article 6(3)(a) (VSLC)

Seller's share - i.e. Article 6(3)(b) (SLLS)

Randomly-selected exposures kept on balance sheet - i.e. Article 6(3)(c) (RSEX)

First loss tranche - i.e. Article 6(3)(d) (FLTR)

First loss exposure in each asset - i.e. Article 6(3)(e) (FLEX)

No compliance with risk retention requirements (NCOM)

Other (OTHR)

NOYES
IVAN6Risk Retention Holder

Which entity is retaining the material net economic interest, as specified in Article 6 of Regulation (EU) 2017/2402, or until its entry into force, Article 405 of Regulation (EU) No 575/2013):

Originator (ORIG)

Sponsor (SPON)

Original Lender (OLND)

Seller (SELL)

No Compliance with Risk Retention Requirement (NCOM)

Other (OTHR)

NOYES
IVAN7Weighted Average LifeEnter the remaining weighted average life of the pool of exposures underlying this transaction, expressed in years.YESYES
Tests/Events/Triggers information section
IVAR1Unique Identifier - ABCP TransactionReport the same unique ABCP transaction identifier here as the one entered into field IVAN2.NONO
IVAR2Original Test/Event/Trigger IdentifierThe original unique test/event/trigger identifier. The reporting entity must not amend this unique identifier.NONO
IVAR3New Test/Event/Trigger IdentifierIf the original identifier in field IVAR2 cannot be maintained in this field enter the new identifier here. If there has been no change in the identifier, enter the same identifier as in IVAR2. The reporting entity must not amend this unique identifier.NONO
IVAR4DescriptionDescribe the test/event/trigger, including any formulae. This is a free text field, however the description of the test/event/trigger includes any formulae and key definitions to allow an investor/potential investor to form a reasonable view of the test/event/trigger and any conditions and consequences attached to it.NONO
IVAR5StatusHas the test been met as at the data cut-off date? In the event of a trigger, is the trigger not being breached?NONO
IVAR6Consequence for Breach

Enter the consequence, as per the securitisation documentation, for this test/event/trigger not being satisfied (i.e. being breached):

Change in the priority of payments (CHPP)

Replacement of a counterparty (CHCP)

Both change in the priority of payments and replacement of a counterparty (BOTH)

Other consequence (OTHR)

NONO