recovery capacity
138the capability of an RRD institution to restore its financial position following a significant deterioration.
[Note: article 2(1)(103) of RRD]
A planned upgrade will take place on 16/05/2024 between 17:00 BST and 19:00 BST. During this time, some features that require authentication may be unavailable.
138the capability of an RRD institution to restore its financial position following a significant deterioration.
[Note: article 2(1)(103) of RRD]