VaR model permission
8an Article 129 implementing measure, a requirement or a waiver that requires a BIPRU firm or an institution to use the VaR model approach on a solo basis or, if the context requires, a consolidated basis.
A planned upgrade will take place on 16/05/2024 between 17:00 BST and 19:00 BST. During this time, some features that require authentication may be unavailable.
8an Article 129 implementing measure, a requirement or a waiver that requires a BIPRU firm or an institution to use the VaR model approach on a solo basis or, if the context requires, a consolidated basis.