upper tier two capital resources
11the sum calculated at stage G of the calculation in the capital resources table (Upper tier two capital)19.
A planned upgrade will take place on 16/05/2024 between 17:00 BST and 19:00 BST. During this time, some features that require authentication may be unavailable.
11the sum calculated at stage G of the calculation in the capital resources table (Upper tier two capital)19.